Sewer Improvement Project
In 2015 we completed a Sewer Improvement project. This eliminated all Combined Sewer Overflow (CSO) points in the sewer system. Our original, state-mandated deadline was 2019.
Check out the panels below to see how we did this in just over 3 years and for more information about CSOs.
Combined Sewer Overflows
-
Untreated or partially treated human and industrial waste
-
Toxic materials
-
Debris
-
Disease-causing organisms
Project Details
-
Residents with a strong environmental ethic
-
The City's preparation to take on this controversial and costly issue
-
State and local leadership and political will to get the work done
Fast Facts by the Numbers
This project has had environmental, financial and social impacts in Grand Rapids. Check out the figures below.
12.6 billion – Gallons of raw, untreated sewage flowing into the Grand River in 1969
0 – Gallons of raw, untreated sewage flowing into the Grand River in 2014
59 – Number of sewer overflow sites and discharges into the Grand River eliminated by separating and replacing storm and sanitary sewers and installing 119 miles of new pipelines
$400 million – Estimated total cost of Sewer Improvement project
1% to 5% – Estimated increase in Grand Rapids property values due to the City’s sanitary and stormwater infrastructure improvements, according to research commissioned by the City through Grand Valley State University
$2.6 billion – Estimated average annual net environmental benefit from Sewer Improvement project, based on GVSU research
$232 million to $418 million – Estimated average annual net economic benefit from Sewer Improvement project
1,500 – Today, Grand Rapids Wastewater Treatment Plant uses approximately 1,500 kWh/MG to treat wastewater. This is a dramatic improvement that benefits ratepayers. By comparison:
1991 = 32 million kWh and $2.7 million spent per year
2015 = 23 million kWh and $1.9 million spent per year
11,000 – homes electrical use in savings
4,437 – Estimated jobs created directly or retained by Grand Rapids Sewer Improvement project
1,120 – Estimated jobs created indirectly or retained by Grand Rapids Sewer Improvement project
$5.5 billion to $9.6 billion – Estimated economic impact over the lifetime of the project based on spending
1 – Number of dams to be removed due to cleaner water
Project Outcomes
Green infrastructure improvements
-
Rain gardens (bioswales)
-
Porous pavement
-
Hydrodynamic separators to remove sediments
Effect on flooding
Future Priorities
-
Better manage stormwater runoff
-
End water pollution in Grand Rapids to ensure the well-being of our citizens
-
Preserve the Grand River for future generations
Project Stakeholders
We completed this project ahead of schedule through committed partnerships with:
- Black & Veatch
- Fishbeck Thompson
- Carr and Huber-Materials Testing Consultants
- Our construction industry partners
This wouldn't have been possible without City staff, Mayors and City Commissioners as well as the will of Grand Rapids’ residents and ratepayers to see this through.